introduction introduction
23X40’Flat racks of Steel Structures from East Cairo to Felixstowe Port ,UK
First Global Logistics successfully managed the transportation of oversized steel structure units for a Cooling Tower Project from the client’s door in East Cairo, Egypt to Felixstowe, United Kingdom.
Project Overview
- Origin (Pickup): East Cairo
- Port of Loading: Alexandria Port
- Destination: Felixstowe, UK
- Number of Units: 78 OOG (Out of Gauge) units
- Total Gross Weight: 350 tons
- Total Volume: 2,800 CBM
- Project Duration: 45 days
- Containers Used: 23 × 40’ Flat Racks
Scope of work:
- Inland transportation
- Traffic permits coordination
- Port handling operations
- Ocean freight arrangements
- “The success and smooth execution of this project—despite the daily operational challenges—wouldn’t be made possible without the excellent teamwork and collaboration between our dedicated staff and our valued partners @NOSCO and @CMA CGM,” said @Khaled Naguib, Director of Operations at First Global Logistics.
